Information Societies Technology (IST) Programme
PHOTONIC CRYSTAL INTEGRATED CIRCUITS (PCIC)
|
Project acronym: PCIC
Project full title: Photonic Crystal Integrated Circuits
Proposal number:IST-1999-11239
Operative commencement date of contract: 1st of February, 2000
For info on the project please contact : weisbuch@pmc.polytechnique.frDetailed description of the project
Participant information exchange page
Objectives |
Photonic Crystals (PCs) in 2 dimensions have recently given rise to striking validation of the basic concepts. The purpose of the PCIC (Photonic Crystal Integrated Circuits) project is to apply these concepts to Photonic Integrated Circuits (PICs) on InP, intented for telecommunication applications, for which we foresee three major advantages: ultra high compacity, simple and low-cost fabrication routes and implementation of novel functionnalities. The aim is to develop integrated-optics oriented PC fabrication routes and combine carefully validated PC modelling tools to achieve several important PC-based building blocks, including low-loss waveguides, bends, couplers, combiners and filters. Demonstrators consisting of integrated systems of active (lasers) and passive elements for WDM applications will be developed to validate the impact of PCs in integrated optics. |
List of participants |
Participant Role |
Participant number |
Participant name |
Participant short name |
Country |
Status* |
Date enter project |
Date exit project |
CO |
1 |
FRANCE TELECOM-CNET |
FT-CNET |
F |
C |
1 |
36 |
CR |
2 |
Centre national de la recherche scientifique Délégation IDF-Sud |
EPP |
F |
P |
1 |
36 |
CR |
3 |
Institut de Micro-et Optoélectronique Ecole polytechnique fédérale de Lausanne |
IMO-EPFL |
CH |
P |
1 |
36 |
CR |
4 |
Foundation for research and technology-Hellas |
FORTH |
EL |
P |
1 |
36 |
CR |
5 |
Kungliga Tekniska Högskoln |
KTH |
S |
P |
1 |
36 |
CR |
6 |
OPTO+ |
OPTO+ |
F |
P |
1 |
36 |
CR |
7 |
Bayerische Julius Maximilians Universität Würzburg |
UWUERZ |
D |
P |
1 |
36 |
*C = Co-ordinator (or use C-F and C-S if financial and scientific co-ordinator roles are separate)
P - Principal contractor
A - Assistant contractor